Project Details
This page displays current information for project DEA: 060U4204.
Project Information
Project Identifiers | Project ID: 215348 DEA: 060U4204 EFIS: 0616000004 |
---|---|
DIST-CO-RTE-PM | 06-FRE-99-R4.9/11.6 |
Award Date | 02/25/2021 |
Closeout Date | Not set |
Work Description | CONSTRUCT CRCP, PLACE HMA, AND ROADWAY EXCAVATION. |
Location Description | FRESNO COUNTY IN AND NEAR SELMA AND FOWLER FROM MCCALL AVENUE UNDERCROSSING TO 0.5 MILE NORTH OF MERCED STREET UNDERCROSSING |
QA Service Level | 1 (Verified on 12/07/2020) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
chris.wilfong@dot.ca.gov | Chris Wilfong | Resident Engineer | Caltrans RE DB |
justin.palmaymesa@dot.ca.gov | Justin Palmaymesa | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 91-100 of 422 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2022-12-08-28 | 12/08/2022 | 12/14/2022 | Quality Assurance | Concrete | View |
2022-12-08-52 | 12/08/2022 | 12/09/2022 | Quality Control | Aggregate | View |
2022-12-08-53 | 12/08/2022 | 12/09/2022 | Quality Control | Concrete | View |
2022-12-09-25 | 12/09/2022 | 12/20/2022 | Quality Assurance | Concrete | View |
2022-12-13-50 | 12/13/2022 | 12/14/2022 | Quality Control | Aggregate | View |
2022-12-13-51 | 12/13/2022 | 12/14/2022 | Quality Control | Concrete | View |
2022-12-15-15 | 12/15/2022 | 12/21/2022 | Quality Assurance | Concrete | View |
2022-12-15-16 | 12/15/2022 | 12/21/2022 | Quality Assurance | Concrete | View |
2022-12-15-32 | 12/15/2022 | 12/16/2022 | Quality Assurance | Concrete | View |
2022-12-22-49 | 12/22/2022 | 12/23/2022 | Quality Assurance | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods