Project Details
This page displays current information for project DEA: 010E0814.
Project Information
Project Identifiers | Project ID: 215304 DEA: 010E0814 EFIS: 0118000172 |
---|---|
DIST-CO-RTE-PM | 01-LAK-20,29,175-Var |
Award Date | 09/20/2021 |
Closeout Date | Not set |
Work Description | Replace & widen bridges |
Location Description | LAKE COUNTY AT VARIOUS LOCATIONS |
QA Service Level | 1 (Verified on 11/04/2020) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
Daniel.Kraft@dot.ca.gov | Daniel Kraft | Resident Engineer | Caltrans RE DB |
j.sanchez.ramos@dot.ca.gov | Juan Sanchez Ramos | Structural Representative | Caltrans SR DB |
peter.gan@dot.ca.gov | Peter Gan | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 21-23 of 23 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2022-12-23-7 | 12/23/2022 | 12/23/2022 | Quality Control | Aggregate | View |
2022-12-23-8 | 12/23/2022 | 12/23/2022 | Quality Control | Aggregate | View |
2022-12-23-9 | 12/23/2022 | 12/23/2022 | Quality Control | Concrete | View |
Go to page:
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods