Project Details
This page displays current information for project DEA: 040A7714.
Project Information
Project Identifiers | Project ID: 215255 DEA: 040A7714 EFIS: 0420000287 |
---|---|
DIST-CO-RTE-PM | 04-ALA-80-6.4-6.6 |
Award Date | 05/03/2021 |
Closeout Date | 12/01/2023 |
Work Description | CONSTRUCT PEDESTRIAN OVERCROSSING BRIDGE AND RETAINING WALLS. GILMAN INTERCHANGE IMPROVEMENTS |
Location Description | ALAMEDA COUNTY IN BERKELEY FROM 0.6 MILE NORTH OF UNIVERSITY AVENUE OVERCROSSING TO 0.1 MILE SOUTH OF GILMAN STREET UNDERCROSSING |
QA Service Level | 1 (Verified on 12/07/2020) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
rebecca.perng@dot.ca.gov | Rebecca Perng | Resident Engineer | Caltrans RE DB |
eric.urmeneta@dot.ca.gov | Eric Urmeneta | Structural Representative | Caltrans SR DB |
Samples
Samples submitted for this project.
Displaying 21-30 of 36 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2022-07-25-1 | 07/25/2022 | 07/27/2022 | Quality Assurance | SMTL TM5 - Headed Bars | View |
2022-07-25-3 | 07/25/2022 | 07/27/2022 | Quality Assurance | SMTL TM5 - Headed Bars | View |
2022-07-25-4 | 07/25/2022 | 07/27/2022 | Quality Assurance | SMTL TM5 - Headed Bars | View |
2022-06-24-53 | 06/24/2022 | 07/06/2022 | Quality Assurance | SMTL TM6 - Steel Check Sample Plate | View |
2022-09-16-1 | 09/16/2022 | 09/19/2022 | Quality Assurance | SMTL TM5 - Headed Bars | View |
2022-11-10-9 | 11/10/2022 | Quality Assurance | SMTL TM6 - Steel Check Sample Plate | View | |
2022-12-07-15 | 12/07/2022 | 12/08/2022 | Quality Assurance | SMTL TM5 - Couplers | View |
2022-12-07-29 | 12/07/2022 | 12/08/2022 | Quality Assurance | SMTL TM5 - Couplers | View |
2021-09-08-2 | 09/08/2021 | 09/10/2021 | Quality Control | SMTL TM5 - Headed Bars | View |
2021-09-29-2 | 09/29/2021 | Quality Control | SMTL TM5 - Welded Hoops | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods