Project Details
This page displays current information for project DEA: 07210624.
Project Information
| Project Identifiers | Project ID: 215220 DEA: 07210624 EFIS: 0719000068 |
|---|---|
| DIST-CO-RTE-PM | 07-LA,SBD-71-1.8/R4.7&R0.0/R0.2 |
| Award Date | 02/05/2021 |
| Closeout Date | Not set |
| Work Description | PLACE STRUCTURE CONCRETE RETAINING WALLS & BOX CULVERT AND PLACE JPCP. |
| Location Description | IN LOS ANGELES AND SAN BERNARDINO COUNTIES IN POMONA AND CHINO HILLS FROM 0.2 MILE SOUTH OF MISSION BOULEVARD OVERCROSSING TO 0.2 MILE OF SAN BERNARDINO COUNTY LINE. |
| QA Service Level | 1 (Verified on 03/24/2021) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| mike.wang@dot.ca.gov | Michael Wang | Resident Engineer | Caltrans RE DB |
| maziar.kazemian@dot.ca.gov | Maziar Kazemian | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 111-120 of 1656 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2025-08-07-75 | 08/07/2025 | 08/07/2025 | Quality Assurance | Concrete | View |
| 2025-08-07-76 | 08/07/2025 | 08/07/2025 | Quality Assurance | Concrete | View |
| 2025-08-07-77 | 08/07/2025 | 08/07/2025 | Quality Assurance | Concrete | View |
| 2025-08-06-32 | 08/06/2025 | 08/06/2025 | Quality Assurance | Concrete | View |
| 2025-08-06-90 | 08/06/2025 | 08/06/2025 | Quality Assurance | Concrete | View |
| 2025-08-05-7 | 08/05/2025 | 08/05/2025 | Acceptance | Soil | View |
| 2025-08-04-43 | 08/04/2025 | 08/04/2025 | Quality Assurance | Concrete | View |
| 2025-08-04-103 | 08/04/2025 | 08/04/2025 | Quality Assurance | Concrete | View |
| 2025-08-03-8 | 08/03/2025 | 08/03/2025 | Quality Assurance | Concrete | View |
| 2025-08-03-9 | 08/03/2025 | 08/03/2025 | Quality Assurance | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
