Project Details
This page displays current information for project DEA: 07210624.
Project Information
Project Identifiers | Project ID: 215220 DEA: 07210624 EFIS: 0719000068 |
---|---|
DIST-CO-RTE-PM | 07-LA,SBD-71-1.8/R4.7&R0.0/R0.2 |
Award Date | 02/05/2021 |
Closeout Date | Not set |
Work Description | PLACE STRUCTURE CONCRETE RETAINING WALLS & BOX CULVERT AND PLACE JPCP. |
Location Description | IN LOS ANGELES AND SAN BERNARDINO COUNTIES IN POMONA AND CHINO HILLS FROM 0.2 MILE SOUTH OF MISSION BOULEVARD OVERCROSSING TO 0.2 MILE OF SAN BERNARDINO COUNTY LINE. |
QA Service Level | 1 (Verified on 03/24/2021) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
mike.wang@dot.ca.gov | Michael Wang | Resident Engineer | Caltrans RE DB |
jeffrey.yu@dot.ca.gov | Jeffrey Yu | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 41-50 of 1134 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2024-07-24-12 | 07/24/2024 | 07/24/2024 | Acceptance | Soil | View |
2024-07-18-55 | 07/18/2024 | 07/23/2024 | Acceptance | Concrete | View |
2024-07-29-1 | 07/29/2024 | 07/29/2024 | Acceptance | Soil | View |
2024-07-29-2 | 07/29/2024 | 07/29/2024 | Acceptance | Soil | View |
2024-08-02-4 | 08/02/2024 | 08/02/2024 | Acceptance | Soil | View |
2024-07-10-105 | 07/10/2024 | 07/15/2024 | Acceptance | Concrete | View |
2024-08-01-77 | 08/01/2024 | 08/02/2024 | Acceptance | Concrete | View |
2024-08-13-20 | 08/13/2024 | 08/13/2024 | Acceptance | Aggregate | View |
2024-08-13-21 | 08/13/2024 | 08/13/2024 | Acceptance | Aggregate | View |
2024-08-08-59 | 08/08/2024 | 08/08/2024 | Acceptance | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods