Project Details
This page displays current information for project DEA: 081F1434.
Project Information
Project Identifiers | Project ID: 215212 DEA: 081F1434 EFIS: 0815000233 |
---|---|
DIST-CO-RTE-PM | 08-RIV-15-38.2/51.5 |
Award Date | 12/04/2020 |
Closeout Date | 03/01/2023 |
Work Description | INDIVIDUAL SLAB REPLACEMENT, REPLACE BASE & GRIND CONCRETE PAVEMENT. |
Location Description | RIVERSIDE COUNTY IN CORONA AND EASTVALE FROM 0.5 MILE SOUTH OF ONTARIO AVENUE UNDERCROSSING TO ROUTE 60/15 SEPARATION |
QA Service Level | 1 (Verified on 03/30/2021) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
alireza.chinichian@dot.ca.gov | Ali Chinichian | Resident Engineer | Caltrans RE DB |
Samples
Samples submitted for this project.
Displaying 81-90 of 104 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2021-10-12-21 | 10/12/2021 | 10/13/2021 | Quality Assurance | Concrete | View |
2021-10-13-28 | 10/13/2021 | 10/14/2021 | Quality Assurance | Concrete | View |
2021-10-13-29 | 10/13/2021 | 10/14/2021 | Quality Assurance | Concrete | View |
2021-10-14-17 | 10/14/2021 | 10/15/2021 | Quality Assurance | Concrete | View |
2021-10-15-12 | 10/15/2021 | 10/17/2021 | Quality Assurance | Concrete | View |
2021-10-15-13 | 10/15/2021 | 10/17/2021 | Quality Assurance | Concrete | View |
2021-10-23-3 | 10/23/2021 | 10/25/2021 | Quality Assurance | Concrete | View |
2022-06-03-39 | 06/03/2022 | 06/06/2022 | Quality Assurance | Hot Mix Asphalt | View |
2022-06-03-8 | 06/03/2022 | 06/08/2022 | Department Acceptance | Hot Mix Asphalt | View |
2022-06-10-28 | 06/10/2022 | 06/17/2022 | Department Acceptance | Hot Mix Asphalt | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods