Project Details
This page displays current information for project DEA: 030J1804.
Project Information
Project Identifiers | Project ID: 215210 DEA: 030J1804 EFIS: 0319000232 |
---|---|
DIST-CO-RTE-PM | 03-COL-5-6.8 |
Award Date | 11/19/2020 |
Closeout Date | 03/01/2022 |
Work Description | CONSTRUCT STRUCTURAL CONCRETE BARRIER SLAB AND CONCRETE BARRIER. |
Location Description | COLUSA COUNTY AT HILLGATE ROAD UNDERCROSSING (BRIDGE NO. 15-0047) |
QA Service Level | 1 (Verified on 10/05/2020) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
garrett.griffith@dot.ca.gov | Garrett Griffith | Resident Engineer | Caltrans RE DB |
Samples
Samples submitted for this project.
Displaying 1-10 of 10 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2021-01-29-13 | 01/29/2021 | 02/04/2021 | Quality Assurance | SMTL TM1 - Elastomeric Bearing Pad | View |
2021-05-17-40 | 05/17/2021 | 05/18/2021 | Quality Control | Concrete | View |
2021-05-19-37 | 05/19/2021 | 05/20/2021 | Quality Control | Concrete | View |
2021-05-21-30 | 05/21/2021 | 05/22/2021 | Quality Control | Concrete | View |
2021-05-24-47 | 05/24/2021 | 05/25/2021 | Quality Control | Concrete | View |
2021-05-27-41 | 05/27/2021 | 05/28/2021 | Quality Control | Concrete | View |
2021-06-03-33 | 06/03/2021 | 06/04/2021 | Quality Control | Concrete | View |
2021-06-04-12 | 06/04/2021 | 06/05/2021 | Quality Control | Concrete | View |
2021-06-08-26 | 06/08/2021 | 06/09/2021 | Quality Control | Concrete | View |
2021-06-11-22 | 06/11/2021 | 06/12/2021 | Quality Control | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods