Project Details
This page displays current information for project DEA: 101C1704.
Project Information
Project Identifiers | Project ID: 215183 DEA: 101C1704 EFIS: 1014000144 |
---|---|
DIST-CO-RTE-PM | 10-MER-99-R12.7/17.8 |
Award Date | 01/22/2021 |
Closeout Date | Not set |
Work Description | RECONSTRUCT ROADWAY WITH ROADWAY EXCAVATION, PLACE HMA AND CRCP. |
Location Description | MERCED COUNTY IN MERCED FROM 0.2 MILE SOUTH OF CHILDS AVENUE OVERCROSSING TO 0.2 MILE SOUTH OF FRANKLIN ROAD OVERCROSSING. |
QA Service Level | 1 (Verified on 10/20/2020) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
wali.waziri@dot.ca.gov | Wali Waziri | Resident Engineer | Caltrans RE DB |
george.samuel@dot.ca.gov | George Samuel | Structural Representative | Caltrans SR DB |
andre.totari@dot.ca.gov | Andre Totari | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 81-90 of 98 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2023-12-12-43 | 12/12/2023 | 12/14/2023 | Quality Assurance | Hot Mix Asphalt | View |
2023-12-12-44 | 12/12/2023 | 12/14/2023 | Quality Assurance | Hot Mix Asphalt | View |
2023-12-13-31 | 12/13/2023 | 12/15/2023 | Quality Assurance | Hot Mix Asphalt | View |
2023-12-13-32 | 12/13/2023 | 12/15/2023 | Quality Assurance | Hot Mix Asphalt | View |
2023-04-17-20 | 04/17/2023 | 04/17/2023 | Acceptance | Roadway/Bridge Surface | View |
2023-04-17-21 | 04/17/2023 | 04/17/2023 | Acceptance | Roadway/Bridge Surface | View |
2023-04-17-22 | 04/17/2023 | 04/17/2023 | Acceptance | Roadway/Bridge Surface | View |
2023-04-18-56 | 04/18/2023 | 04/18/2023 | Acceptance | Roadway/Bridge Surface | View |
2023-04-25-23 | 04/25/2023 | 04/25/2023 | Acceptance | Roadway/Bridge Surface | View |
2023-08-29-33 | 08/29/2023 | 08/29/2023 | Acceptance | Roadway/Bridge Surface | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods