Project Details
This page displays current information for project DEA: 101C1704.
Project Information
Project Identifiers | Project ID: 215183 DEA: 101C1704 EFIS: 1014000144 |
---|---|
DIST-CO-RTE-PM | 10-MER-99-R12.7/17.8 |
Award Date | 01/22/2021 |
Closeout Date | Not set |
Work Description | RECONSTRUCT ROADWAY WITH ROADWAY EXCAVATION, PLACE HMA AND CRCP. |
Location Description | MERCED COUNTY IN MERCED FROM 0.2 MILE SOUTH OF CHILDS AVENUE OVERCROSSING TO 0.2 MILE SOUTH OF FRANKLIN ROAD OVERCROSSING. |
QA Service Level | 1 (Verified on 10/20/2020) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
wali.waziri@dot.ca.gov | Wali Waziri | Resident Engineer | Caltrans RE DB |
george.samuel@dot.ca.gov | George Samuel | Structural Representative | Caltrans SR DB |
andre.totari@dot.ca.gov | Andre Totari | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 41-50 of 98 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2022-11-01-55 | 11/01/2022 | 11/01/2022 | Quality Control | Aggregate | View |
2022-11-01-56 | 11/01/2022 | 11/01/2022 | Quality Control | Aggregate | View |
2022-11-01-57 | 11/01/2022 | 11/01/2022 | Quality Control | Concrete | View |
2022-11-01-58 | 11/01/2022 | 11/01/2022 | Quality Control | Concrete | View |
2023-01-30-44 | 01/30/2023 | 02/03/2023 | Quality Assurance | Hot Mix Asphalt | View |
2023-01-30-73 | 01/30/2023 | 03/29/2023 | Quality Assurance | Asphalt Binder | View |
2023-01-31-28 | 01/31/2023 | 01/31/2023 | Quality Assurance | Hot Mix Asphalt | View |
2023-01-31-41 | 01/31/2023 | 03/29/2023 | Acceptance | Asphalt Binder | View |
2023-01-31-42 | 01/31/2023 | 03/29/2023 | Acceptance | Asphalt Binder | View |
2023-01-31-43 | 01/31/2023 | 03/29/2023 | Acceptance | Asphalt Binder | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods