Project Details
This page displays current information for project DEA: 101C5004.
Project Information
Project Identifiers | Project ID: 215168 DEA: 101C5004 EFIS: 1016000026 |
---|---|
DIST-CO-RTE-PM | 10-SJ-4,5-T15.5/R16.7,25.8/26.5 |
Award Date | 12/09/2020 |
Closeout Date | 09/14/2023 |
Work Description | CONSTRUCT JPCP, CRCP, AND APPROACH SLABS. |
Location Description | SAN JOAQUIN COUNTY IN STOCKTON ON ROUTE 4 FROM 0.2 MILE EAST OF FRESNO AVENUE TO EL DORADO STREET AND ON ROUTE 5 FROM TAYLOR STREET OVERHEAD TO STOCKTON CHANNEL VIADUCT |
QA Service Level | 1 (Verified on 10/19/2020) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
stan.oshita@dot.ca.gov | Stan Oshita | Resident Engineer | Caltrans RE DB |
Samples
Samples submitted for this project.
Displaying 1-9 of 9 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2021-11-15-59 | 11/15/2021 | 11/15/2021 | Quality Assurance | Rapid Set | View |
2021-11-01-53 | 11/01/2021 | 11/02/2021 | Quality Assurance | Rapid Set | View |
2021-10-21-29 | 10/21/2021 | 12/06/2021 | Department Acceptance | Asphalt Binder | View |
2021-10-20-51 | 10/20/2021 | 12/06/2021 | Department Acceptance | Asphalt Binder | View |
2021-10-19-42 | 10/19/2021 | 12/07/2021 | Department Acceptance | Asphalt Binder | View |
2021-09-22-33 | 09/22/2021 | 09/27/2021 | Quality Assurance | SMTL TM5 - Couplers | View |
2021-09-17-37 | 09/17/2021 | 10/07/2021 | Department Acceptance | Asphalt Binder | View |
2021-09-15-30 | 09/15/2021 | 09/16/2021 | Authorization | Rapid Set | View |
2021-09-15-29 | 09/15/2021 | 09/16/2021 | Authorization | Rapid Set | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods