Project Details
This page displays current information for project DEA: 030H4604.
Project Information
Project Identifiers | Project ID: 215145 DEA: 030H4604 EFIS: 0315000174 |
---|---|
DIST-CO-RTE-PM | 03-PLA-80-2.6/3.1 |
Award Date | 11/16/2020 |
Closeout Date | 08/24/2022 |
Work Description | WIDEN ON-RAMP AND REPLACE BRIDGE. |
Location Description | PLACER COUNTY IN ROSEVILLE AT THE ATLANTIC STREET ON RAMP |
QA Service Level | 1 (Verified on 10/05/2020) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
Justin.Kunert@dot.ca.gov | Justin Kunert | Resident Engineer | Caltrans RE DB |
carl.c.anderson@dot.ca.gov | Carl Anderson | Structural Representative | Caltrans SR DB |
Samples
Samples submitted for this project.
Displaying 11-20 of 62 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2021-06-28-7 | 06/28/2021 | 06/29/2021 | Quality Assurance | Concrete | View |
2021-07-13-4 | 07/13/2021 | 07/14/2021 | Quality Assurance | Concrete | View |
2021-08-11-4 | 08/11/2021 | 08/12/2021 | Quality Assurance | Concrete | View |
2021-08-13-9 | 08/13/2021 | 08/16/2021 | Quality Assurance | Concrete | View |
2021-08-24-5 | 08/24/2021 | 08/25/2021 | Quality Assurance | Concrete | View |
2021-08-30-10 | 08/30/2021 | 08/31/2021 | Quality Assurance | Concrete | View |
2021-10-20-17 | 10/20/2021 | 10/21/2021 | Quality Assurance | Concrete | View |
2021-10-20-43 | 10/20/2021 | 10/20/2021 | Quality Control | Aggregate | View |
2021-10-20-44 | 10/20/2021 | 10/20/2021 | Quality Control | Aggregate | View |
2021-10-20-45 | 10/20/2021 | 10/20/2021 | Quality Control | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods