Project Details
This page displays current information for project DEA: 030H4604.
Project Information
Project Identifiers | Project ID: 215145 DEA: 030H4604 EFIS: 0315000174 |
---|---|
DIST-CO-RTE-PM | 03-PLA-80-2.6/3.1 |
Award Date | 11/16/2020 |
Closeout Date | 08/24/2022 |
Work Description | WIDEN ON-RAMP AND REPLACE BRIDGE. |
Location Description | PLACER COUNTY IN ROSEVILLE AT THE ATLANTIC STREET ON RAMP |
QA Service Level | 1 (Verified on 10/05/2020) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
Justin.Kunert@dot.ca.gov | Justin Kunert | Resident Engineer | Caltrans RE DB |
carl.c.anderson@dot.ca.gov | Carl Anderson | Structural Representative | Caltrans SR DB |
Samples
Samples submitted for this project.
Displaying 1-10 of 62 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2021-11-04-30 | 11/04/2021 | 11/04/2021 | Quality Control | Aggregate | View |
2021-11-04-31 | 11/04/2021 | 11/04/2021 | Quality Control | Aggregate | View |
2021-10-20-43 | 10/20/2021 | 10/20/2021 | Quality Control | Aggregate | View |
2021-10-20-44 | 10/20/2021 | 10/20/2021 | Quality Control | Aggregate | View |
2021-11-15-24 | 11/15/2021 | 11/15/2021 | Quality Control | Aggregate | View |
2021-11-15-25 | 11/15/2021 | 11/15/2021 | Quality Control | Aggregate | View |
2021-11-12-30 | 11/12/2021 | 11/12/2021 | Quality Control | Aggregate | View |
2021-11-15-27 | 11/15/2021 | 11/12/2021 | Quality Control | Aggregate | View |
2021-11-24-28 | 11/24/2021 | 11/24/2021 | Quality Control | Aggregate | View |
2021-11-24-29 | 11/24/2021 | 11/24/2021 | Quality Control | Aggregate | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods