Project Details
This page displays current information for project DEA: 010G33U4.
Project Information
Project Identifiers | Project ID: 215126 DEA: 010G33U4 EFIS: 0120000002 |
---|---|
DIST-CO-RTE-PM | 01-LAK-20-5.1/6.3 |
Award Date | 11/19/2020 |
Closeout Date | 10/07/2022 |
Work Description | Widen shoulders and replace bridge with box culvert. |
Location Description | LAKE COUNTY NEAR UPPER LAKE FROM 0.4 MILE WEST OF WITTER SPRINGS ROAD TO 0.4 MILE EAST OF BACHELOR CREEK BRIDGE |
QA Service Level | 1 (Verified on 08/26/2020) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
katharine.perrin@dot.ca.gov | Katharine Perrin | Resident Engineer | Caltrans RE DB |
Samples
Samples submitted for this project.
Displaying 41-50 of 79 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2021-06-07-40 | 06/07/2021 | 06/07/2021 | Quality Control | Concrete | View |
2021-06-09-41 | 06/09/2021 | 06/09/2021 | Quality Control | Concrete | View |
2021-08-16-44 | 08/16/2021 | 08/16/2021 | Quality Control | Concrete | View |
2021-08-20-32 | 08/20/2021 | 08/20/2021 | Quality Control | Concrete | View |
2021-08-23-24 | 08/23/2021 | 08/23/2021 | Quality Control | Concrete | View |
2021-08-26-50 | 08/26/2021 | 08/26/2021 | Quality Control | Concrete | View |
2021-08-27-26 | 08/27/2021 | 08/27/2021 | Quality Control | Concrete | View |
2021-08-30-35 | 08/30/2021 | 08/30/2021 | Quality Control | Concrete | View |
2021-09-01-29 | 09/01/2021 | 09/01/2021 | Quality Control | Concrete | View |
2021-09-03-12 | 09/03/2021 | 09/03/2021 | Quality Control | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods