Project Details
This page displays current information for project DEA: 081C8504.
Project Information
Project Identifiers | Project ID: 215109 DEA: 081C8504 EFIS: 0813000047 |
---|---|
DIST-CO-RTE-PM | 08-RIV-74-0.0/5.8 |
Award Date | Not set |
Closeout Date | Not set |
Work Description | ROADWAY EXCAVATION, HOT MIX ASPHALT, AND STRUCTURAL SHOTCRETE WALLS. |
Location Description | RIVERSIDE COUNTY NEAR LAKE ELSINORE FROM ORANGE COUNTY LINE TO MONTE VISTA STREET |
QA Service Level | 1 (Verified on 02/24/2021) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
osama.abdalla@dot.ca.gov | Osama Abdalla | Resident Engineer | Caltrans RE DB |
ryan@pacificpros.com | Ryan Kash (Reports) | Structural Representative | Caltrans SR DB |
joshua.fry@dot.ca.gov | Joshua Fry | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 1-10 of 354 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2021-08-14-1 | 08/14/2021 | 08/17/2021 | Verification | Aggregate | View |
2021-08-14-3 | 08/14/2021 | 08/17/2021 | Verification | Asphalt Binder | View |
2021-09-13-1 | 09/13/2021 | 09/20/2021 | Verification | SMTL TM5 - Threaded Bar | View |
2022-03-01-13 | 03/01/2022 | 03/02/2022 | Verification | Aggregate | View |
2022-06-12-4 | 06/12/2022 | 06/21/2022 | Verification | Aggregate | View |
2022-07-21-52 | 07/21/2022 | 08/10/2022 | Verification | Aggregate | View |
2022-10-24-17 | 10/24/2022 | 10/27/2022 | Verification | Aggregate | View |
2022-11-17-8 | 11/17/2022 | 11/18/2022 | Verification | Aggregate | View |
2023-04-30-6 | 04/30/2023 | 05/08/2023 | Verification | Aggregate | View |
2023-06-20-20 | 06/20/2023 | 06/23/2023 | Verification | Aggregate | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods