Project Details
This page displays current information for project DEA: 081C8504.
Project Information
| Project Identifiers | Project ID: 215109 DEA: 081C8504 EFIS: 0813000047 |
|---|---|
| DIST-CO-RTE-PM | 08-RIV-74-0.0/5.8 |
| Award Date | 11/12/2020 |
| Closeout Date | 06/02/2025 |
| Work Description | ROADWAY EXCAVATION, HOT MIX ASPHALT, AND STRUCTURAL SHOTCRETE WALLS. |
| Location Description | RIVERSIDE COUNTY NEAR LAKE ELSINORE FROM ORANGE COUNTY LINE TO MONTE VISTA STREET |
| QA Service Level | 1 (Verified on 02/24/2021) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| osama.abdalla@dot.ca.gov | Osama Abdalla | Resident Engineer | Caltrans RE DB |
| ryan@pacificpros.com | Ryan Kash (Reports) | Structural Representative | Caltrans SR DB |
Samples
Samples submitted for this project.
Displaying 131-140 of 354 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2022-03-13-1 | 03/13/2022 | 03/13/2022 | Quality Assurance | Hot Mix Asphalt | View |
| 2022-03-13-2 | 03/13/2022 | 03/13/2022 | Quality Assurance | Hot Mix Asphalt | View |
| 2022-03-13-3 | 03/13/2022 | 03/13/2022 | Quality Assurance | Hot Mix Asphalt | View |
| 2022-03-17-6 | 03/17/2022 | 03/17/2022 | Quality Assurance | Soil | View |
| 2022-03-17-7 | 03/17/2022 | 03/17/2022 | Quality Assurance | Soil | View |
| 2022-03-19-3 | 03/19/2022 | 03/19/2022 | Quality Assurance | Soil | View |
| 2022-03-19-4 | 03/19/2022 | 03/19/2022 | Quality Assurance | Soil | View |
| 2022-03-13-6 | 03/13/2022 | 03/13/2022 | Quality Assurance | Soil | View |
| 2022-03-23-2 | 03/23/2022 | 03/23/2022 | Quality Assurance | Soil | View |
| 2022-03-23-3 | 03/23/2022 | 03/23/2022 | Quality Assurance | Soil | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
