Project Details
This page displays current information for project DEA: 060Q9104.
Project Information
Project Identifiers | Project ID: 215075 DEA: 060Q9104 EFIS: 0614000005 |
---|---|
DIST-CO-RTE-PM | 06-TUL-99-19.2/19.8 |
Award Date | 09/25/2020 |
Closeout Date | 05/11/2023 |
Work Description | BRIDGE DECK AND OUTSIDE GIRDER REPLACEMENT. |
Location Description | TULARE COUNTY NEAR TIPTON FROM 0.3 MILE SOUTH TO 0.3 MILE NORTH OF AVENUE 152 OVERCROSSING |
QA Service Level | 1 (Verified on 07/28/2020) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
javier.huerta@dot.ca.gov | Javier Huerta | Resident Engineer | Caltrans RE DB |
peter.moua@dot.ca.gov | Peter Moua | Structural Representative | Caltrans SR DB |
Samples
Samples submitted for this project.
Displaying 11-20 of 58 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2021-05-26-30 | 05/26/2021 | 05/26/2021 | Quality Control | Aggregate | View |
2021-05-27-23 | 05/27/2021 | 05/27/2021 | Quality Control | Aggregate | View |
2021-06-03-6 | 06/03/2021 | 06/04/2021 | Quality Control | Concrete | View |
2021-06-04-1 | 06/04/2021 | 06/05/2021 | Quality Control | Concrete | View |
2021-06-07-3 | 06/07/2021 | 06/09/2021 | Quality Control | Concrete | View |
2021-06-08-2 | 06/08/2021 | 06/09/2021 | Quality Control | Concrete | View |
2021-06-10-15 | 06/10/2021 | 06/11/2021 | Quality Control | Concrete | View |
2021-06-11-5 | 06/11/2021 | 06/12/2021 | Quality Control | Concrete | View |
2021-06-09-7 | 06/09/2021 | 06/09/2021 | Quality Control | Aggregate | View |
2021-06-09-8 | 06/09/2021 | 06/09/2021 | Quality Control | Aggregate | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods