Project Details
This page displays current information for project DEA: 032F5704.
Project Information
Project Identifiers | Project ID: 215063 DEA: 032F5704 EFIS: 0300020615 |
---|---|
DIST-CO-RTE-PM | 03-PLA-80-46.3/63.5 |
Award Date | 09/23/2020 |
Closeout Date | 08/11/2023 |
Work Description | Replace 4 Bridges (OC) on Highway 80 from Crystal Springs to Cisco Grove (Baxter, Drum Forebay) |
Location Description | Not set |
QA Service Level | 1 (Verified on 11/16/2020) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
tad.sampson@dot.ca.gov | Tad Sampson | Resident Engineer | Caltrans RE DB |
jimmer.ross@dot.ca.gov | Jimmer Ross | Structural Representative | Caltrans SR DB |
Samples
Samples submitted for this project.
Displaying 291-300 of 371 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2021-09-03-21 | 09/03/2021 | 09/03/2021 | Quality Control | Aggregate | View |
2021-09-08-28 | 09/08/2021 | 09/08/2021 | Quality Control | Aggregate | View |
2021-09-08-29 | 09/08/2021 | 09/08/2021 | Quality Control | Aggregate | View |
2021-09-09-39 | 09/09/2021 | 09/09/2021 | Quality Control | Aggregate | View |
2021-09-09-40 | 09/09/2021 | 09/09/2021 | Quality Control | Aggregate | View |
2021-09-17-34 | 09/17/2021 | 09/17/2021 | Quality Control | Aggregate | View |
2021-09-17-35 | 09/17/2021 | 09/17/2021 | Quality Control | Aggregate | View |
2021-10-12-15 | 10/12/2021 | 10/12/2021 | Quality Control | Aggregate | View |
2021-10-12-16 | 10/12/2021 | 10/12/2021 | Quality Control | Aggregate | View |
2021-10-14-26 | 10/14/2021 | 10/14/2021 | Quality Control | Aggregate | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods