Project Details
This page displays current information for project DEA: 032F5704.
Project Information
Project Identifiers | Project ID: 215063 DEA: 032F5704 EFIS: 0300020615 |
---|---|
DIST-CO-RTE-PM | 03-PLA-80-46.3/63.5 |
Award Date | 09/23/2020 |
Closeout Date | 08/11/2023 |
Work Description | Replace 4 Bridges (OC) on Highway 80 from Crystal Springs to Cisco Grove (Baxter, Drum Forebay) |
Location Description | Not set |
QA Service Level | 1 (Verified on 11/16/2020) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
tad.sampson@dot.ca.gov | Tad Sampson | Resident Engineer | Caltrans RE DB |
jimmer.ross@dot.ca.gov | Jimmer Ross | Structural Representative | Caltrans SR DB |
Samples
Samples submitted for this project.
Displaying 361-370 of 371 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2021-04-06-2 | 04/06/2021 | 04/07/2021 | Quality Assurance | SMTL TM5 - Headed Bars | View |
2021-04-06-1 | 04/06/2021 | 04/07/2021 | Quality Assurance | SMTL TM5 - Headed Bars | View |
2021-03-25-3 | 03/25/2021 | 03/29/2021 | Quality Assurance | SMTL TM5 - Headed Bars | View |
2021-03-25-2 | 03/25/2021 | 03/29/2021 | Quality Assurance | SMTL TM5 - Headed Bars | View |
2021-03-12-2 | 03/12/2021 | Quality Control | SMTL TM5 - Welded Hoops | View | |
2021-03-12-1 | 03/12/2021 | 03/15/2021 | Quality Assurance | SMTL TM5 - Welded Hoops | View |
2021-02-16-19 | 02/16/2021 | 02/19/2021 | Quality Assurance | SMTL TM6 - Ductile Iron Cast Samples | View |
2021-02-08-8 | 02/08/2021 | Quality Control | SMTL TM5 - Welded Hoops | View | |
2021-02-08-7 | 02/08/2021 | 02/12/2021 | Quality Assurance | SMTL TM5 - Welded Hoops | View |
2021-01-04-2 | 01/04/2021 | 01/04/2021 | Quality Assurance | SMTL TM5 - Welded Hoops | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods