Project Details
This page displays current information for project DEA: 033H6504.
Project Information
| Project Identifiers | Project ID: 215033 DEA: 033H6504 EFIS: 0318000027 |
|---|---|
| DIST-CO-RTE-PM | 03-NEV-49-8.3/8.7 |
| Award Date | 08/07/2020 |
| Closeout Date | 09/23/2021 |
| Work Description | CONSTRUCT A TWO-WAY LEFT-TURN LANE AND 8' SHOULDERS. |
| Location Description | NEVADA COUNTY ON ROUTE 49 FROM 0.1 MILE SOUTH OF ROUND VALLEY ROAD TO 0.1 MILE NORTH OF QUAIL CREEK DRIVE |
| QA Service Level | 1 (Verified on 06/22/2020) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| Christopher.Fallbeck@dot.ca.gov | Christopher Fallbeck | Resident Engineer | Caltrans RE DB |
| farzan.kazemi@dot.ca.gov | Farzan Kazemi | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 1-8 of 8 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2021-04-12-65 | 04/12/2021 | 04/13/2021 | Verification | Aggregate | View |
| 2021-04-12-66 | 04/12/2021 | 04/13/2021 | Verification | Hot Mix Asphalt | View |
| 2021-04-12-67 | 04/12/2021 | 04/13/2021 | Verification | Reclaimed Asphalt Pavement | View |
| 2021-04-12-68 | 04/12/2021 | 04/13/2021 | Verification | Asphalt Binder | View |
| 2021-05-18-27 | 05/18/2021 | 05/25/2021 | Department Acceptance | Asphalt Binder | View |
| 2021-05-18-48 | 05/18/2021 | 06/11/2021 | Department Acceptance | Asphalt Binder | View |
| 2021-05-19-36 | 05/19/2021 | 06/11/2021 | Department Acceptance | Asphalt Binder | View |
| 2021-05-21-27 | 05/21/2021 | 06/11/2021 | Department Acceptance | Asphalt Rubber Binder | View |
Job Mix Formula (JMF)
JMFs associated with this project.
Displaying 1-1 of 1 result.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| JMF3511-23-2021-79 | Submittal Authorized For Use | CT D03 - Olivehurst Northern Regional Laboratory | 06/21/2021 | View |
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
