Project Details
This page displays current information for project DEA: 030H5204.
Project Information
Project Identifiers | Project ID: 215032 DEA: 030H5204 EFIS: 0315000202 |
---|---|
DIST-CO-RTE-PM | 03-ED-50-0.0/80.4 |
Award Date | 08/13/2020 |
Closeout Date | 07/26/2023 |
Work Description | INSTALL CMS, CAMERA SYSTEMS AND TMS ELEMENTS. |
Location Description | EL DORADO COUNTY AT VARIOUS LOCATIONS FROM THE SACRAMENTO COUNTY LINE TO CALIFORNIA/NEVADA STATE LINE |
QA Service Level | 1 (Verified on 07/20/2020) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
juanah.koker@dot.ca.gov | Juanah Koker | Resident Engineer | Caltrans RE DB |
Samples
Samples submitted for this project.
Displaying 1-10 of 14 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2021-07-12-54 | 07/12/2021 | 07/12/2021 | Quality Control | Aggregate | View |
2021-07-12-55 | 07/12/2021 | 07/12/2021 | Quality Control | Aggregate | View |
2021-07-28-4 | 07/28/2021 | 07/28/2021 | Quality Assurance | Concrete | View |
2021-07-12-56 | 07/12/2021 | 07/12/2021 | Quality Control | Concrete | View |
2021-02-02-3 | 02/02/2021 | Quality Assurance | SMTL TM3 - Fastener Assembly | View | |
2021-02-02-5 | 02/02/2021 | Quality Assurance | SMTL TM3 - Fastener Assembly | View | |
2021-02-02-6 | 02/02/2021 | Quality Assurance | SMTL TM3 - Fastener Assembly | View | |
2021-03-05-5 | 03/05/2021 | 03/15/2021 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
2021-05-20-1 | 05/20/2021 | 05/24/2021 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
2021-05-20-2 | 05/20/2021 | 05/24/2021 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods