Project Details
This page displays current information for project DEA: 051J4804.
Project Information
Project Identifiers | Project ID: 215018 DEA: 051J4804 EFIS: 0517000185 |
---|---|
DIST-CO-RTE-PM | 05-SBT-25,156-54.048 |
Award Date | 11/18/2021 |
Closeout Date | 07/31/2024 |
Work Description | SAN BENITO HIGHWAY 25 AT 156 ROUNDABOUT - SAFETY IMPROVEMENTS |
Location Description | SAN BENITO COUNTY NEAR HOLLISTER ON ROUTE 25 FROM 0.4 MILE EAST TO 0.3 MILE WEST OF ROUTE 156 AND ON ROUTE 156 FROM 0.4 MILE SOUTH TO 0.3 MILE NORTH OF ROUTE 25 |
QA Service Level | 1 (Verified on 09/03/2020) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
baljinder.s.brar@dot.ca.gov | Baljinder Brar | Resident Engineer | Caltrans RE DB |
neil.weller@dot.ca.gov | Neil Weller | Structural Representative | Caltrans SR DB |
Samples
Samples submitted for this project.
Displaying 1-8 of 8 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2023-08-17-23 | 08/17/2023 | 08/21/2023 | Quality Assurance | Concrete | View |
2023-08-16-49 | 08/16/2023 | 08/21/2023 | Quality Assurance | Concrete | View |
2023-05-17-58 | 05/17/2023 | 05/23/2023 | Department Acceptance | Asphalt Binder | View |
2022-06-09-48 | 06/09/2022 | 07/01/2022 | Department Acceptance | Asphalt Binder | View |
2020-05-11-25 | 05/11/2020 | 05/11/2020 | Informational | Soil | View |
2020-05-11-24 | 05/11/2020 | 05/11/2020 | Informational | Soil | View |
2020-05-11-23 | 05/11/2020 | 05/11/2020 | Informational | Soil | View |
2020-05-11-22 | 05/11/2020 | 05/11/2020 | Informational | Soil | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods