Project Details
This page displays current information for project DEA: 101C9404.
Project Information
Project Identifiers | Project ID: 215014 DEA: 101C9404 EFIS: 1016000020 |
---|---|
DIST-CO-RTE-PM | 10-SJ-5-26.4/27.0 |
Award Date | 11/03/2020 |
Closeout Date | 03/03/2022 |
Work Description | BRIDGE REHABILITATION |
Location Description | ON STATE HIGHWAY IN SAN JOAQUIN COUNTY IN STOCKTON FROM 0.3 MILE NORTH OF ROUTE 5/4 SEPARATION TO PERSHING AVENUE |
QA Service Level | 1 (Verified on 06/03/2020) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
chris.hanson@dot.ca.gov | Chris Hanson | Resident Engineer | Caltrans RE DB |
ron.matin@dot.ca.gov | Ron Matin | Structural Representative | Caltrans SR DB |
Samples
Samples submitted for this project.
Displaying 1-8 of 8 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2021-02-09-34 | 02/09/2021 | 02/23/2021 | Per Request | Concrete | View |
2021-04-08-26 | 04/08/2021 | 04/12/2021 | Quality Assurance | Rapid Set | View |
2021-02-24-24 | 02/24/2021 | 03/04/2021 | Quality Assurance | Rapid Set | View |
2021-02-09-42 | 02/09/2021 | 02/09/2021 | Quality Assurance | Rapid Set | View |
2021-05-21-29 | 05/21/2021 | 05/21/2021 | Authorization | Rapid Set | View |
2021-02-09-12 | 02/09/2021 | 02/12/2021 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
2021-02-09-15 | 02/09/2021 | 02/12/2021 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
2021-02-09-16 | 02/09/2021 | 03/12/2021 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods