Project Details
This page displays current information for project DEA: 040J6204.
Project Information
Project Identifiers | Project ID: 215003 DEA: 040J6204 EFIS: 0414000019 |
---|---|
DIST-CO-RTE-PM | 04-ALA-680-12.4/21.9 |
Award Date | 04/12/2022 |
Closeout Date | Not set |
Work Description | REHABILITATE PAVEMENT - RPL APP/DEP SLABS, 14 BRIDGES |
Location Description | ALAMEDA COUNTY AT SUNOL AND IN PLEASANTON AND DUBLIN FROM KOOPMANN ROAD UNDERCROSSING TO ALAMEDA COUNTY LINE |
QA Service Level | 1 (Verified on 10/19/2020) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
betty.geng@dot.ca.gov | Betty Geng | Structural Representative | Caltrans SR DB |
dylan.larose@dot.ca.gov | Dylan Larose | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 71-80 of 279 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2022-10-31-28 | 10/31/2022 | 10/31/2022 | Quality Control | Concrete | View |
2022-11-01-33 | 11/01/2022 | 11/01/2022 | Quality Control | Concrete | View |
2022-11-02-24 | 11/02/2022 | 11/02/2022 | Quality Control | Concrete | View |
2022-11-03-49 | 11/03/2022 | 11/03/2022 | Quality Control | Concrete | View |
2022-11-07-14 | 11/07/2022 | 11/07/2022 | Quality Control | Concrete | View |
2022-11-09-6 | 11/09/2022 | 11/09/2022 | Quality Control | Concrete | View |
2022-11-07-6 | 11/07/2022 | 11/14/2022 | Quality Assurance | SMTL TM7 - Epoxy Coated Dowels | View |
2022-11-17-38 | 11/17/2022 | 11/17/2022 | Quality Control | Concrete | View |
2022-11-22-16 | 11/22/2022 | 11/22/2022 | Quality Control | Concrete | View |
2022-11-28-16 | 11/28/2022 | 11/28/2022 | Quality Control | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods