Project Details
This page displays current information for project DEA: 040J6204.
Project Information
Project Identifiers | Project ID: 215003 DEA: 040J6204 EFIS: 0414000019 |
---|---|
DIST-CO-RTE-PM | 04-ALA-680-12.4/21.9 |
Award Date | 04/12/2022 |
Closeout Date | Not set |
Work Description | REHABILITATE PAVEMENT - RPL APP/DEP SLABS, 14 BRIDGES |
Location Description | ALAMEDA COUNTY AT SUNOL AND IN PLEASANTON AND DUBLIN FROM KOOPMANN ROAD UNDERCROSSING TO ALAMEDA COUNTY LINE |
QA Service Level | 1 (Verified on 10/19/2020) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
betty.geng@dot.ca.gov | Betty Geng | Structural Representative | Caltrans SR DB |
dylan.larose@dot.ca.gov | Dylan Larose | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 31-40 of 279 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2023-05-24-29 | 05/24/2023 | 05/25/2023 | Quality Control | Concrete | View |
2023-05-23-38 | 05/23/2023 | 05/24/2023 | Quality Control | Concrete | View |
2023-05-22-44 | 05/22/2023 | 05/23/2023 | Quality Control | Concrete | View |
2023-05-19-32 | 05/19/2023 | 05/20/2023 | Quality Control | Concrete | View |
2023-05-18-53 | 05/18/2023 | 05/19/2023 | Quality Control | Concrete | View |
2023-05-17-22 | 05/17/2023 | 05/18/2023 | Quality Control | Concrete | View |
2023-05-16-34 | 05/16/2023 | 05/17/2023 | Quality Control | Concrete | View |
2023-05-15-24 | 05/15/2023 | 05/16/2023 | Quality Control | Concrete | View |
2023-05-12-33 | 05/12/2023 | 05/13/2023 | Quality Control | Concrete | View |
2023-05-11-42 | 05/11/2023 | 05/12/2023 | Quality Control | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods