Project Details
This page displays current information for project DEA: 044H0504.
Project Information
Project Identifiers | Project ID: 214998 DEA: 044H0504 EFIS: 0413000080 |
---|---|
DIST-CO-RTE-PM | 04-SON-12-25.8-33.3 |
Award Date | 07/29/2022 |
Closeout Date | Not set |
Work Description | BRIDGE SCOUR MITIGATION |
Location Description | SONOMA COUNTY NEAR SANTA ROSA AT SONOMA CREEK BRIDGE AND AT HOOKER CREEK BRIDGE |
QA Service Level | 1 (Verified on 09/10/2020) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
leonard.brajnikoff@dot.ca.gov | leonard brajnikoff | Resident Engineer | Caltrans RE DB |
Anthony.Tierra@dot.ca.gov | Anthony tierra | Structural Representative | Caltrans SR DB |
waqas.ather@dot.ca.gov | Waqas Ather | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 1-10 of 52 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2023-03-27-2 | 03/27/2023 | Quality Control | SMTL TM5 - Welded Hoops | View | |
2023-04-26-14 | 04/26/2023 | Quality Control | SMTL TM5 - Welded Hoops | View | |
2023-05-04-20 | 05/04/2023 | 05/04/2023 | Quality Control | Concrete | View |
2023-05-05-35 | 05/05/2023 | 05/05/2023 | Quality Control | Concrete | View |
2023-05-06-2 | 05/06/2023 | 05/06/2023 | Quality Control | Concrete | View |
2023-06-02-4 | 06/02/2023 | Quality Control | SMTL TM5 - Welded Hoops | View | |
2023-05-04-48 | 05/04/2023 | 05/05/2023 | Quality Control | Concrete | View |
2023-08-21-31 | 08/21/2023 | 08/22/2023 | Quality Control | Concrete | View |
2023-08-21-38 | 08/21/2023 | 08/28/2023 | Quality Control | Concrete | View |
2023-08-19-50 | 08/19/2023 | 08/21/2023 | Quality Control | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Displaying 1-9 of 9 results.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
ASTM-EPD-341 | Hot-rolled Structural Steel Sections | Steel Dynamics, Incorporated -Structural And Rail Division | Bethlehem Construction, Incorporated (Keith Lancial) | 38959.00 lbs |
ASTM-EPD-341 | Hot-rolled Structural Steel Sections | Steel Dynamics, Incorporated -Structural And Rail Division | Bethlehem Construction, Incorporated (Keith Lancial) | 19198.00 lbs |
ASTM-EPD-341 | Hot-rolled Structural Steel Sections | Steel Dynamics, Incorporated -Structural And Rail Division | Bethlehem Construction, Incorporated (Keith Lancial) | 47976.00 lbs |
ASTM-EPD-341 | Hot-rolled Structural Steel Sections | Steel Dynamics, Incorporated -Structural And Rail Division | Bethlehem Construction, Incorporated (Keith Lancial) | 47440.00 lbs |
ASTM-EPD-341 | Hot-rolled Structural Steel Sections | Steel Dynamics, Incorporated -Structural And Rail Division | Bethlehem Construction, Incorporated (Keith Lancial) | 28796.00 lbs |
ASTM-EPD-341 | Hot-rolled Structural Steel Sections | Steel Dynamics, Incorporated -Structural And Rail Division | Bethlehem Construction, Incorporated (Keith Lancial) | 47968.00 lbs |
ASTM-EPD-341 | Hot-rolled Structural Steel Sections | Steel Dynamics, Incorporated -Structural And Rail Division | Bethlehem Construction, Incorporated (Keith Lancial) | 47992.00 lbs |
ASTM-EPD-341 | Hot-rolled Structural Steel Sections | Steel Dynamics, Incorporated -Structural And Rail Division | Bethlehem Construction, Incorporated (Keith Lancial) | 47973.00 lbs |
EPD-191 | Carbon Steel Rebar | CMC Steel Arizona | Alta Group (Scott Flower) | 159,907 Lbs |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods