Project Details
This page displays current information for project DEA: 051F5004.
Project Information
Project Identifiers | Project ID: 214993 DEA: 051F5004 EFIS: 0514000003 |
---|---|
DIST-CO-RTE-PM | 05-SB-101,135-70.6/71.2;0.1 |
Award Date | 11/17/2020 |
Closeout Date | 01/11/2024 |
Work Description | CONSTRUCT CONCRETE BRIDGE, BRIDGE REMOVAL, COLD PLANE, PLACE HMA. |
Location Description | SANTA BARBARA COUNTY AT LOS ALAMOS ON ROUTE 101 FROM 0.3 MILE SOUTH TO 0.3 MILE NORTH OF ROUTE 101/135 SEPARATION AND ON ROUTE 135 AT ROUTE 101/135 SEPARATION |
QA Service Level | 1 (Verified on 09/03/2020) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
jason.torres@dot.ca.gov | Jason Torres | Resident Engineer | Caltrans RE DB |
alex.martinez@dot.ca.gov | Alex Martinez | Structural Representative | Caltrans SR DB |
Samples
Samples submitted for this project.
Displaying 51-60 of 85 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2022-07-01-2 | 07/01/2022 | 07/05/2022 | Quality Assurance | SMTL TM5 - Welded Hoops | View |
2022-08-02-34 | 08/02/2022 | 08/04/2022 | Quality Assurance | SMTL TM1 - Elastomeric Bearing Pad | View |
2022-09-29-17 | 09/29/2022 | 09/29/2022 | Quality Assurance | Aggregate | View |
2022-09-29-18 | 09/29/2022 | 09/30/2022 | Quality Assurance | Concrete | View |
2022-09-30-3 | 09/30/2022 | 09/30/2022 | Quality Assurance | Aggregate | View |
2022-10-05-1 | 10/05/2022 | 10/05/2022 | Quality Assurance | Soil | View |
2022-10-20-20 | 10/20/2022 | 10/20/2022 | Quality Assurance | Aggregate | View |
2022-10-24-5 | 10/24/2022 | 10/24/2022 | Quality Assurance | Aggregate | View |
2022-10-24-14 | 10/24/2022 | 10/24/2022 | Quality Assurance | Aggregate | View |
2022-10-31-21 | 10/31/2022 | 10/31/2022 | Quality Assurance | Aggregate | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods