Project Details
This page displays current information for project DEA: 044J2104.
Project Information
Project Identifiers | Project ID: 214970 DEA: 044J2104 EFIS: 0415000288 |
---|---|
DIST-CO-RTE-PM | 04-NAP-121-18.6 |
Award Date | 12/15/2020 |
Closeout Date | Not set |
Work Description | STRUCTURE EXCAVATION, INSTALL TEMPORARY SIGNAL SYSTEM AND CONCRETE. |
Location Description | NAPA COUNTY NEAR NAPA AT CAPELL CREEK BRIDGE |
QA Service Level | 1 (Verified on 10/19/2020) |
Samples
Samples submitted for this project.
Displaying 1-1 of 1 result.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2021-07-12-34 | 07/12/2021 | 07/19/2021 | Quality Assurance | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted by | DIME Sample ID | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs submitted for this project.
Declaration Number | Program Operator | Material Type | Vendor | Submitted by |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods