Project Details

This page displays current information for project DEA: 010F3104.

Project Information

Project IdentifiersProject ID: 214873
DEA: 010F3104
EFIS: 0115000108
DIST-CO-RTE-PM01-DN-101-39.8
Award Date05/28/2020
Closeout Date10/07/2022
Work DescriptionREMOVE REINFORCED CONCRETE BOX CULVERT AND CONSTRUCT BRIDGE.
Location DescriptionDEL NORTE COUNTY NEAR SMITH RIVER AT DOMINIE CREEK
QA Service Level1 (Verified on 06/04/2020)

Caltrans Project Personnel

Personnel stored in Caltrans' project databases.

Email AddressFull NameRolePersonnel Source
karen.sanders@dot.ca.govKaren SandersResident EngineerCaltrans RE DB
brian.cinkutis@dot.ca.govBrian CinkutisStructural RepresentativeCaltrans SR DB

Samples

Samples submitted for this project.

Displaying 1-10 of 11 results.
DIME Sample IDSample Taken DateSample Received DateSample TypeMaterial TypeLink
   
2020-11-17-1111/17/202011/18/2020Quality ControlConcreteView
2020-11-24-811/24/202011/25/2020Quality ControlConcreteView
2020-12-02-412/02/202012/03/2020Quality ControlConcreteView
2020-12-14-1412/14/202012/15/2020Quality ControlConcreteView
2020-12-18-212/18/202012/19/2020Quality ControlConcreteView
2020-12-18-312/18/202012/21/2020Quality AssuranceConcreteView
2021-01-04-301/04/202101/05/2021Quality ControlConcreteView
2021-01-14-1401/14/202101/15/2021Quality ControlConcreteView
2021-01-15-401/15/202101/19/2021Quality AssuranceConcreteView
2021-03-31-503/31/202104/02/2021Quality AssuranceConcreteView

Job Mix Formula (JMF)

JMFs associated with this project.

JMF IDStatusSubmitted ByCreated ByDate CreatedLink
No results found.

Environmental Product Declaration (EPD)

EPDs material quantities submitted for this project.

Declaration NumberMaterial TypeVendorSubmitted byQuantity
No results found.

Project Summary Graphs


Samples Taken and Tests performed per Month


Number of Samples

Sample Types

Number of Tests

Test Types

Material Types

Test Methods