Project Details
This page displays current information for project DIME:214863.
Project Information
Project Identifiers | Project ID: 214863 Permit Numbers: 04196SN1026 04196RW2094 04206RT0278 04216RT0063 |
---|---|
DIST-CO-RTE-PM | 04-SCL-82-11.2 |
Award Date | 07/01/2019 |
Closeout Date | 05/01/2023 |
Work Description | Traffic signal modifications at the SW corner of El Camino Real (Rt 82 )Benton Street will require the pulling of conductors within the State Right of Way. |
Location Description | El Camino Real, Santa Clara |
QA Service Level | 1 (Verified on 10/19/2020) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
casey.tarokh@dot.ca.gov | Casey Tarokh | Resident Engineer | Caltrans RE DB |
Samples
Samples submitted for this project.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
No results found. |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods