Project Details
This page displays current information for project DEA: 11424904.
Project Information
Project Identifiers | Project ID: 214858 DEA: 11424904 EFIS: 1116000094 |
---|---|
DIST-CO-RTE-PM | 11-SD-5,8,15,52,54-Var |
Award Date | 05/13/2020 |
Closeout Date | 09/14/2023 |
Work Description | Install roadside signs. |
Location Description | 11-SD-5, 8, 15, 52, 54, etc.-Var. |
QA Service Level | 1 (Verified on 11/30/2020) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
genaro.genel@dot.ca.gov | Genaro Genel | Resident Engineer | Caltrans RE DB |
Samples
Samples submitted for this project.
Displaying 1-6 of 6 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2021-04-27-10 | 04/27/2021 | 04/27/2021 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
2021-04-27-9 | 04/27/2021 | 04/27/2021 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
2021-04-27-8 | 04/27/2021 | 04/27/2021 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
2021-04-27-7 | 04/27/2021 | 04/27/2021 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
2021-04-27-6 | 04/27/2021 | 04/27/2021 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
2021-04-27-5 | 04/27/2021 | 04/27/2021 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods