Project Details
This page displays current information for project DEA: 034H1004.
Project Information
Project Identifiers | Project ID: 214841 DEA: 034H1004 EFIS: 0318000176 |
---|---|
DIST-CO-RTE-PM | 03-SIE-49-9.2/24.7 |
Award Date | 05/29/2020 |
Closeout Date | 07/29/2022 |
Work Description | INSTALL RETAINING STRUCTURE AND RSP CONCRETE EMBANKMENT. |
Location Description | SIERRA COUNTY ON ROUTE 49 AT VARIOUS LOCATIONS |
QA Service Level | 1 (Verified on 03/24/2020) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
christopher.fallbeck@dot.ca.gov | Christopher Fallbeck | Resident Engineer | Caltrans RE DB |
jimmer.ross@dot.ca.gov | Jimmer Ross | Structural Representative | Caltrans SR DB |
Samples
Samples submitted for this project.
Displaying 21-30 of 63 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2021-07-15-59 | 07/15/2021 | 07/15/2021 | Quality Control | Aggregate | View |
2021-07-15-60 | 07/15/2021 | 07/15/2021 | Quality Control | Aggregate | View |
2021-07-07-31 | 07/07/2021 | 07/07/2021 | Quality Control | Concrete | View |
2021-07-07-39 | 07/07/2021 | 07/07/2021 | Quality Control | Aggregate | View |
2021-07-07-40 | 07/07/2021 | 07/07/2021 | Quality Control | Aggregate | View |
2021-06-30-38 | 06/30/2021 | 06/30/2021 | Quality Control | Aggregate | View |
2021-06-30-39 | 06/30/2021 | 06/30/2021 | Quality Control | Aggregate | View |
2021-06-30-40 | 06/30/2021 | 06/30/2021 | Quality Control | Concrete | View |
2021-06-30-41 | 06/30/2021 | 06/30/2021 | Quality Control | Concrete | View |
2021-06-30-42 | 06/30/2021 | 06/30/2021 | Quality Control | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
Displaying 1-1 of 1 result.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
JMF3511-23-2021-32 | Submittal Accepted for Verification | CT D03 - Olivehurst Northern Regional Laboratory | 02/05/2021 | View |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods