Project Details
This page displays current information for project DEA: 043G6304.
Project Information
Project Identifiers | Project ID: 214830 DEA: 043G6304 EFIS: 0412000409 |
---|---|
DIST-CO-RTE-PM | 04-SCL-4-SCl-9 -4.75/4.9 |
Award Date | 11/08/2022 |
Closeout Date | Not set |
Work Description | Saratoga Creek Bridge Rehabilitation Project |
Location Description | San Jose - Saratoga Creek |
QA Service Level | 1 (Verified on 11/09/2020) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
arif.khan@dot.ca.gov | Arif Khan | Resident Engineer | Caltrans RE DB |
oanh.bui@dot.ca.gov | OANH BUI | Structural Representative | Caltrans SR DB |
christopher.m.mcdermott@dot.ca.gov | Christopher McDermott | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 41-50 of 91 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2023-08-15-68 | 08/15/2023 | 08/25/2023 | Quality Assurance | Concrete | View |
2023-08-31-41 | 08/31/2023 | 09/05/2023 | Quality Assurance | SMTL TM1 - Elastomeric Bearing Pad | View |
2023-08-31-50 | 08/31/2023 | 09/11/2023 | Quality Assurance | SMTL TM1 - Elastomeric Bearing Pad | View |
2023-07-18-5 | 07/18/2023 | Quality Control | SMTL TM5 - Welded Hoops | View | |
2023-09-06-12 | 09/06/2023 | 09/07/2023 | Quality Control | Concrete | View |
2023-09-07-10 | 09/07/2023 | 09/08/2023 | Quality Control | Concrete | View |
2023-09-08-21 | 09/08/2023 | 09/09/2023 | Quality Control | Concrete | View |
2023-09-11-6 | 09/11/2023 | 09/12/2023 | Quality Control | Concrete | View |
2023-09-12-36 | 09/12/2023 | 09/13/2023 | Quality Control | Concrete | View |
2023-09-13-2 | 09/13/2023 | 09/14/2023 | Quality Control | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Displaying 1-2 of 2 results.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
4789971287.103.1 | Steel Plate | Nucor Steel, Incorporated - Tuscaloosa | Steel Girder LLC Stinger Bridge and Iron (Nancy Henderson) | 22,300 Lbs |
4789793365.102.1 | Hot-rolled Structural Steel Sections | Nucor-Yamato Steel - Arkansas | Steel Girder LLC Stinger Bridge and Iron (Nancy Henderson) | 137,000 Lbs |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods