Project Details
This page displays current information for project DEA: 043G6304.
Project Information
Project Identifiers | Project ID: 214830 DEA: 043G6304 EFIS: 0412000409 |
---|---|
DIST-CO-RTE-PM | 04-SCL-4-SCl-9 -4.75/4.9 |
Award Date | 11/08/2022 |
Closeout Date | Not set |
Work Description | Saratoga Creek Bridge Rehabilitation Project |
Location Description | San Jose - Saratoga Creek |
QA Service Level | 1 (Verified on 11/09/2020) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
arif.khan@dot.ca.gov | Arif Khan | Resident Engineer | Caltrans RE DB |
oanh.bui@dot.ca.gov | OANH BUI | Structural Representative | Caltrans SR DB |
christopher.m.mcdermott@dot.ca.gov | Christopher McDermott | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 81-90 of 91 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2023-09-29-15 | 09/29/2023 | 09/30/2023 | Quality Control | Concrete | View |
2023-10-02-5 | 10/02/2023 | 10/02/2023 | Quality Control | Aggregate | View |
2023-10-02-20 | 10/02/2023 | 10/02/2023 | Quality Control | Concrete | View |
2023-10-03-29 | 10/03/2023 | 10/03/2023 | Quality Control | Concrete | View |
2023-10-10-14 | 10/10/2023 | 10/16/2023 | Verification | SMTL TM3 - Fastener Assembly | View |
2023-11-09-65 | 11/09/2023 | 11/10/2023 | Quality Control | Aggregate | View |
2023-11-09-66 | 11/09/2023 | 11/10/2023 | Quality Control | Aggregate | View |
2023-11-09-67 | 11/09/2023 | 11/09/2023 | Quality Control | Concrete | View |
2023-11-21-40 | 11/21/2023 | 11/21/2023 | Quality Control | Aggregate | View |
2023-11-21-41 | 11/21/2023 | 11/22/2023 | Quality Control | Aggregate | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Displaying 1-2 of 2 results.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
4789971287.103.1 | Steel Plate | Nucor Steel, Incorporated - Tuscaloosa | Steel Girder LLC Stinger Bridge and Iron (Nancy Henderson) | 22,300 Lbs |
4789793365.102.1 | Hot-rolled Structural Steel Sections | Nucor-Yamato Steel - Arkansas | Steel Girder LLC Stinger Bridge and Iron (Nancy Henderson) | 137,000 Lbs |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods