Project Details
This page displays current information for project DEA: 051H2304.
Project Information
| Project Identifiers | Project ID: 214817 DEA: 051H2304 EFIS: 0516000042 |
|---|---|
| DIST-CO-RTE-PM | 05-MON-218-R0.2/L0.9 |
| Award Date | 11/08/2022 |
| Closeout Date | 03/03/2025 |
| Work Description | CONSTRUCT CURB RAMPS AND SIDEWALK, MODIFY SIGNAL AND LIGHTING SYSTEMS. |
| Location Description | MONTEREY COUNTY IN SEASIDE FROM DEL MONTE BOULEVARD TO FREMONT BOULEVARD |
| QA Service Level | 1 (Verified on 08/31/2020) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| arashdeep.pannu@dot.ca.gov | Arashdeep (Art) Pannu | Resident Engineer | Caltrans RE DB |
Samples
Samples submitted for this project.
Displaying 1-5 of 5 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2023-11-01-43 | 11/01/2023 | 11/03/2023 | Quality Assurance | Asphaltic Emulsion | View |
| 2020-03-13-15 | 03/13/2020 | 03/16/2020 | Preliminary | Soil | View |
| 2020-03-13-14 | 03/13/2020 | 03/16/2020 | Preliminary | Soil | View |
| 2020-03-13-13 | 03/13/2020 | 03/16/2020 | Preliminary | Soil | View |
| 2020-03-13-12 | 03/13/2020 | 03/16/2020 | Preliminary | Soil | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
