Project Details
This page displays current information for project DEA: 030H3424.
Project Information
Project Identifiers | Project ID: 214795 DEA: 030H3424 EFIS: 0317000153 |
---|---|
DIST-CO-RTE-PM | 03-SAC-99-22.6 |
Award Date | 11/13/2020 |
Closeout Date | 03/03/2022 |
Work Description | REPLACE BRIDGE DECK WITH PRESTRESSED CONCRETE BOX GIRDER. |
Location Description | SACRAMENTO COUNTY IN SACRAMENTO AT 21ST AVENUE UNDERCROSSING |
QA Service Level | 1 (Verified on 03/12/2020) |
Samples
Samples submitted for this project.
Displaying 1-10 of 25 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2021-06-14-13 | 06/14/2021 | 06/15/2021 | Acceptance | Asphaltic Emulsion | View |
2021-03-24-3 | 03/24/2021 | 03/24/2021 | Quality Assurance | Concrete | View |
2021-03-30-22 | 03/30/2021 | 03/31/2021 | Quality Control | Concrete | View |
2021-04-01-11 | 04/01/2021 | 04/02/2021 | Quality Control | Concrete | View |
2021-04-02-13 | 04/02/2021 | 04/03/2021 | Quality Control | Concrete | View |
2021-04-05-7 | 04/05/2021 | 04/06/2021 | Quality Control | Concrete | View |
2021-04-06-12 | 04/06/2021 | 04/07/2021 | Quality Control | Concrete | View |
2021-04-08-16 | 04/08/2021 | 04/09/2021 | Quality Assurance | Concrete | View |
2021-04-12-16 | 04/12/2021 | 04/13/2021 | Quality Control | Concrete | View |
2021-04-14-3 | 04/14/2021 | 04/14/2021 | Quality Assurance | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs submitted for this project.
Declaration Number | Program Operator | Material Type | Vendor | Submitted by |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods