Project Details
This page displays current information for project DIME:214783.
Project Information
Project Identifiers | Project ID: 214783 Permit Numbers: 1119NUR0675 1119NRW0703 1119NRW0891 1120NRT0116 |
---|---|
DIST-CO-RTE-PM | 11-IMP-8-36.5/37.5 |
Award Date | 07/01/2019 |
Closeout Date | 08/24/2021 |
Work Description | enter upon State Highway right of way in Imperial County, City of El Centro, on Interstate 8, post mile R36.50 to R37.50, to replace existing 18-inch diameter steel water pipeline with new PVC water pipeline and extension of storm drain pipeline to IID structure by Horizontal Directional Drilling |
Location Description | INTERSTATE 8, EL CENTRO |
QA Service Level | 1 (Verified on 03/02/2020) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
daniel.hernandez.duarte@dot.ca.gov | Daniel Hernandez-Duarte | Resident Engineer | Caltrans RE DB |
manuel.plancarte@dot.ca.gov | Manuel Plancarte | Structural Representative | Caltrans SR DB |
julien.atallah@dot.ca.gov | Julien Atallah | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
No results found. |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods