Project Details

This page displays current information for project DIME:214783.

Project Information

Project IdentifiersProject ID: 214783
Permit Numbers: 1119NUR0675 1119NRW0703 1119NRW0891 1120NRT0116
DIST-CO-RTE-PM11-IMP-8-36.5/37.5
Award Date07/01/2019
Closeout Date08/24/2021
Work Descriptionenter upon State Highway right of way in Imperial County, City of El Centro, on Interstate 8, post mile R36.50 to R37.50, to replace existing 18-inch diameter steel water pipeline with new PVC water pipeline and extension of storm drain pipeline to IID structure by Horizontal Directional Drilling
Location DescriptionINTERSTATE 8, EL CENTRO
QA Service Level1 (Verified on 03/02/2020)

Caltrans Project Personnel

Personnel stored in Caltrans' project databases.

Email AddressFull NameRolePersonnel Source
daniel.hernandez.duarte@dot.ca.govDaniel Hernandez-DuarteResident EngineerCaltrans RE DB
manuel.plancarte@dot.ca.govManuel PlancarteStructural RepresentativeCaltrans SR DB
julien.atallah@dot.ca.govJulien AtallahMETS REPCaltrans METS REP DB

Samples

Samples submitted for this project.

Job Mix Formula (JMF)

JMFs associated with this project.

JMF IDStatusSubmitted ByCreated ByDate CreatedLink
No results found.

Environmental Product Declaration (EPD)

EPDs material quantities submitted for this project.

Declaration NumberMaterial TypeVendorSubmitted byQuantity
No results found.

Project Summary Graphs


Samples Taken and Tests performed per Month


Number of Samples

Sample Types

Number of Tests

Test Types

Material Types

Test Methods