Project Details
This page displays current information for project DEA: 030F2864.
Project Information
Project Identifiers | Project ID: 214702 DEA: 030F2864 EFIS: 0320000123 |
---|---|
DIST-CO-RTE-PM | 03-SAC-99-7.92 / 8.4 |
Award Date | 06/24/2020 |
Closeout Date | 11/28/2023 |
Work Description | Remove and replace Consumnes River and Consumnes River Overflow bridge |
Location Description | Sacramento County |
QA Service Level | 1 (Verified on 04/20/2020) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
Masoud.Saed@dot.ca.gov | Masoud Saed | Resident Engineer | Caltrans RE DB |
chau.ha@dot.ca.gov | Chau Ha | Structural Representative | Caltrans SR DB |
mihai.hantelmann@dot.ca.gov | Mihai Hantelmann | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 31-40 of 420 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2020-08-24-8 | 08/24/2020 | 08/25/2020 | Quality Control | Concrete | View |
2020-08-28-10 | 08/28/2020 | 08/28/2020 | Quality Control | Concrete | View |
2020-08-27-9 | 08/27/2020 | 08/27/2020 | Quality Control | Concrete | View |
2020-08-31-6 | 08/31/2020 | 08/31/2020 | Quality Control | Concrete | View |
2020-09-02-3 | 09/02/2020 | 09/02/2020 | Quality Control | Concrete | View |
2020-09-02-5 | 09/02/2020 | 09/03/2020 | Quality Control | Concrete | View |
2020-09-04-3 | 09/04/2020 | 09/05/2020 | Quality Control | Concrete | View |
2020-09-08-6 | 09/08/2020 | 09/09/2020 | Quality Control | Concrete | View |
2020-09-08-10 | 09/08/2020 | 09/09/2020 | Quality Control | Concrete | View |
2020-09-08-11 | 09/08/2020 | 09/09/2020 | Quality Control | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods