Project Details
This page displays current information for project DEA: 030F2864.
Project Information
Project Identifiers | Project ID: 214702 DEA: 030F2864 EFIS: 0320000123 |
---|---|
DIST-CO-RTE-PM | 03-SAC-99-7.92 / 8.4 |
Award Date | 06/24/2020 |
Closeout Date | 11/28/2023 |
Work Description | Remove and replace Consumnes River and Consumnes River Overflow bridge |
Location Description | Sacramento County |
QA Service Level | 1 (Verified on 04/20/2020) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
Masoud.Saed@dot.ca.gov | Masoud Saed | Resident Engineer | Caltrans RE DB |
chau.ha@dot.ca.gov | Chau Ha | Structural Representative | Caltrans SR DB |
mihai.hantelmann@dot.ca.gov | Mihai Hantelmann | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 221-230 of 420 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2021-04-20-9 | 04/20/2021 | 04/21/2021 | Quality Control | Concrete | View |
2021-04-20-15 | 04/20/2021 | 04/22/2021 | Quality Assurance | Concrete | View |
2021-04-21-10 | 04/21/2021 | 04/22/2021 | Quality Assurance | Concrete | View |
2021-04-22-14 | 04/22/2021 | 04/26/2021 | Quality Assurance | Concrete | View |
2021-04-26-9 | 04/26/2021 | 04/27/2021 | Quality Control | Concrete | View |
2021-04-27-13 | 04/27/2021 | 04/28/2021 | Quality Control | Concrete | View |
2021-04-29-6 | 04/29/2021 | 04/30/2021 | Quality Control | Concrete | View |
2021-05-05-16 | 05/05/2021 | 05/06/2021 | Quality Control | Concrete | View |
2021-05-06-8 | 05/06/2021 | 05/07/2021 | Quality Control | Concrete | View |
2021-05-07-3 | 05/07/2021 | 05/08/2021 | Quality Control | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods