Project Details
This page displays current information for project DEA: 030F2864.
Project Information
| Project Identifiers | Project ID: 214702 DEA: 030F2864 EFIS: 0320000123 |
|---|---|
| DIST-CO-RTE-PM | 03-SAC-99-7.92 / 8.4 |
| Award Date | 06/24/2020 |
| Closeout Date | 11/28/2023 |
| Work Description | Remove and replace Consumnes River and Consumnes River Overflow bridge |
| Location Description | Sacramento County |
| QA Service Level | 1 (Verified on 04/20/2020) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| Masoud.Saed@dot.ca.gov | Masoud Saed | Resident Engineer | Caltrans RE DB |
| chau.ha@dot.ca.gov | Chau Ha | Structural Representative | Caltrans SR DB |
| mihai.hantelmann@dot.ca.gov | Mihai Hantelmann | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 141-150 of 420 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2020-09-08-11 | 09/08/2020 | 09/09/2020 | Quality Control | Concrete | View |
| 2020-09-10-5 | 09/10/2020 | 09/11/2020 | Quality Control | Concrete | View |
| 2020-09-11-6 | 09/11/2020 | 09/12/2020 | Quality Control | Concrete | View |
| 2020-09-14-13 | 09/14/2020 | 09/15/2020 | Quality Control | Concrete | View |
| 2020-09-14-17 | 09/14/2020 | 09/15/2020 | Quality Assurance | Concrete | View |
| 2020-09-15-2 | 09/15/2020 | 09/16/2020 | Quality Control | Concrete | View |
| 2020-09-16-5 | 09/16/2020 | 09/17/2020 | Quality Control | Concrete | View |
| 2020-09-14-22 | 09/14/2020 | 09/17/2020 | Quality Assurance | Concrete | View |
| 2020-09-14-23 | 09/14/2020 | 09/17/2020 | Quality Assurance | Concrete | View |
| 2020-09-16-6 | 09/16/2020 | 09/17/2020 | Quality Assurance | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
