Project Details
This page displays current information for project DEA: 030F2844.
Project Information
Project Identifiers | Project ID: 214701 DEA: 030F2844 EFIS: 0319000204 |
---|---|
DIST-CO-RTE-PM | 03-SAC-99-7.1/9.4 |
Award Date | 05/14/2020 |
Closeout Date | 11/27/2023 |
Work Description | Construct new PCC precast girder bridge over UPRR at McConnell OH between existing SB and NB alignments |
Location Description | Not set |
QA Service Level | 1 (Verified on 04/20/2020) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
Masoud.Saed@dot.ca.gov | Masoud Saed | Resident Engineer | Caltrans RE DB |
chau.ha@dot.ca.gov | Chau Ha | Structural Representative | Caltrans SR DB |
mihai.hantelmann@dot.ca.gov | Mihai Hantelmann | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 81-87 of 87 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2020-06-29-15 | 06/29/2020 | 07/01/2020 | Quality Assurance | SMTL TM5 - Couplers | View |
2020-08-19-14 | 08/19/2020 | 08/24/2020 | Quality Assurance | SMTL TM5 - Couplers | View |
2020-06-29-14 | 06/29/2020 | 07/01/2020 | Quality Assurance | SMTL TM5 - Headed Bars | View |
2020-05-19-3 | 05/19/2020 | 05/27/2020 | Quality Assurance | SMTL TM5 - Welded Hoops | View |
2020-08-05-15 | 08/05/2020 | 08/11/2020 | Quality Assurance | SMTL TM6 - Ductile Iron Cast Samples | View |
2020-08-20-21 | 08/20/2020 | 08/24/2020 | Quality Assurance | SMTL TM6 - Ductile Iron Cast Samples | View |
2020-09-04-2 | 09/04/2020 | 09/08/2020 | Quality Assurance | SMTL TM6 - Ductile Iron Cast Samples | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods