Project Details
This page displays current information for project DEA: 120N8904.
Project Information
Project Identifiers | Project ID: 214698 DEA: 120N8904 EFIS: 1214000130 |
---|---|
DIST-CO-RTE-PM | 12-ORA-133-8.3/M9.3 |
Award Date | 11/09/2023 |
Closeout Date | Not set |
Work Description | CONSTRUCT AUXILIARY LANE. |
Location Description | ORANGE COUNTY IN IRVINE FROM ROUTE 133/405 SEPARATION TO IRVINE CENTER DRIVE OVERCROSSING |
QA Service Level | 1 (Verified on 02/22/2021) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
aghiam@fountainheadcorp.com | Arezo Ghiam | Resident Engineer | Caltrans RE DB |
melissa.quintana@dot.ca.gov | Melissa Quintana | Structural Representative | Caltrans SR DB |
danny.chung@dot.ca.gov | Danny Chung | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 1-10 of 54 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2024-07-31-49 | 07/31/2024 | 08/01/2024 | Quality Assurance | Concrete | View |
2024-07-31-50 | 07/31/2024 | 08/01/2024 | Quality Assurance | Concrete | View |
2024-07-23-90 | 07/23/2024 | 07/25/2024 | Quality Assurance | Concrete | View |
2024-07-13-13 | 07/13/2024 | 07/15/2024 | Quality Assurance | Concrete | View |
2024-07-11-109 | 07/11/2024 | 07/12/2024 | Quality Assurance | Concrete | View |
2024-06-27-90 | 06/27/2024 | 06/28/2024 | Quality Assurance | Concrete | View |
2024-06-20-171 | 06/20/2024 | 06/24/2024 | Quality Assurance | Concrete | View |
2024-06-13-94 | 06/13/2024 | 06/14/2024 | Quality Assurance | Concrete | View |
2024-06-07-50 | 06/07/2024 | 06/10/2024 | Quality Assurance | Concrete | View |
2024-06-07-52 | 06/07/2024 | 06/10/2024 | Quality Assurance | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Displaying 1-4 of 4 results.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
4790372675.101.1 | Carbon Steel Rebar | Nucor Steel, Incorporated - Plymouth | CT METS QASI - Los Angeles Design Build Field Laboratory (Danny Chung) | 254690 lbs |
SCS-EPD-09168 | Carbon Steel Rebar | Vinton Steel, LLC. | CT METS QASI - Los Angeles Design Build Field Laboratory (Danny Chung) | 254689 lbs |
4790066131.101.1 | Carbon Steel Rebar | Cascade Steel Rolling Mills, Incorporated | CT METS QASI - Los Angeles Design Build Field Laboratory (Danny Chung) | 254690 lbs |
EPD-191 | Carbon Steel Rebar | CMC Steel Arizona | CT METS QASI - Los Angeles Design Build Field Laboratory (Danny Chung) | 254690 lbs |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods