Project Details
This page displays current information for project DEA: 07307104.
Project Information
Project Identifiers | Project ID: 214697 DEA: 07307104 EFIS: 0714000213 |
---|---|
DIST-CO-RTE-PM | 07-LA-101-32.8 |
Award Date | Not set |
Closeout Date | Not set |
Work Description | CONSTRUCT BRIDGE. |
Location Description | LOS ANGELES COUNTY IN AND NEAR AGOURA HILLS FROM 0.1 MILE WEST OF LIBERTY CANYON ROAD UNDERCROSSING TO 0.6 MILE EAST OF PALO COMADO OVERCROSSING |
QA Service Level | 1 (Verified on 07/12/2021) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
Sam.Toutounchian@dot.ca.gov | Sam Toutounchian | Resident Engineer | Caltrans RE DB |
darwin.vargas@dot.ca.gov | Darwin Vargas | Structural Representative | Caltrans SR DB |
james.devey@dot.ca.gov | James Devey | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 31-40 of 137 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2023-06-20-93 | 06/20/2023 | 06/20/2023 | Quality Control | Aggregate | View |
2023-06-21-92 | 06/21/2023 | 06/21/2023 | Quality Control | Concrete | View |
2023-06-27-141 | 06/27/2023 | 06/27/2023 | Quality Control | Aggregate | View |
2023-06-29-78 | 06/29/2023 | 07/12/2023 | Quality Control | Concrete | View |
2023-07-06-119 | 07/06/2023 | 07/06/2023 | Quality Control | Aggregate | View |
2023-07-11-107 | 07/11/2023 | 07/11/2023 | Quality Control | Aggregate | View |
2023-07-12-84 | 07/12/2023 | 07/12/2023 | Quality Control | Concrete | View |
2023-07-14-15 | 07/14/2023 | 07/14/2023 | Quality Assurance | Aggregate | View |
2023-07-14-16 | 07/14/2023 | 07/14/2023 | Quality Assurance | Aggregate | View |
2023-07-14-17 | 07/14/2023 | 07/14/2023 | Quality Assurance | Aggregate | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods