Project Details

This page displays current information for project DEA: 024E46U4.

Project Information

Project IdentifiersProject ID: 214685
DEA: 024E46U4
EFIS: 0216000122
DIST-CO-RTE-PM02-LAS-36-6.0/14.6
Award Date05/08/2020
Closeout Date08/14/2023
Work DescriptionREPLACE BRIDGE, ROADWAY EXCAVATION, HMA, CLASS 2 AB AND DRAINAGE WORK.
Location DescriptionLASSEN COUNTY NEAR WESTWOOD FROM 1.3 MILES WEST OF GOODRICH CREEK BRIDGE TO 1.0 MILE WEST OF WILLARD CREEK ROAD
QA Service Level1 (Verified on 03/02/2020)

Caltrans Project Personnel

Personnel stored in Caltrans' project databases.

Email AddressFull NameRolePersonnel Source
tim.crosby@dot.ca.govTim CrosbyResident EngineerCaltrans RE DB
jeff.rothgery@dot.ca.govJeff RothgeryStructural RepresentativeCaltrans SR DB

Samples

Samples submitted for this project.

Displaying 1-10 of 38 results.
DIME Sample IDSample Taken DateSample Received DateSample TypeMaterial TypeLink
2020-06-10-3306/10/202006/26/2020AcceptanceAsphalt BinderView
2020-07-01-2507/01/202006/26/2020AcceptanceAsphalt BinderView
2020-07-08-2407/08/202007/14/2020AcceptanceAsphalt BinderView
2020-10-06-2110/06/202010/15/2020AcceptanceAsphalt BinderView
2020-10-09-2510/09/202010/23/2020AcceptanceAsphalt BinderView
2021-10-08-1610/08/202110/09/2021AcceptanceAggregateView
2021-10-08-1710/08/202110/09/2021AcceptanceReclaimed Asphalt PavementView
2021-10-08-1810/08/202110/09/2021AcceptanceAggregateView
2021-10-08-2010/08/202110/09/2021AcceptanceHot Mix AsphaltView
2021-10-15-1410/15/202110/18/2021AcceptanceHot Mix AsphaltView

Job Mix Formula (JMF)

JMFs associated with this project.

Displaying 1-2 of 2 results.
JMF IDStatusSubmitted ByCreated ByDate CreatedLink
JMF3511-22-2020-301Submittal Rejected For Use CT D02 - Redding Northern Regional Laboratory10/30/2020View
JMF3511-22-2020-284Submittal Rejected For Use CT D02 - Redding Northern Regional Laboratory09/03/2020View

Environmental Product Declaration (EPD)

EPDs material quantities submitted for this project.

Declaration NumberMaterial TypeVendorSubmitted byQuantity
No results found.

Project Summary Graphs


Samples Taken and Tests performed per Month


Number of Samples

Sample Types

Number of Tests

Test Types

Material Types

Test Methods