Project Details
This page displays current information for project DEA: 024E46U4.
Project Information
Project Identifiers | Project ID: 214685 DEA: 024E46U4 EFIS: 0216000122 |
---|---|
DIST-CO-RTE-PM | 02-LAS-36-6.0/14.6 |
Award Date | 05/08/2020 |
Closeout Date | 08/14/2023 |
Work Description | REPLACE BRIDGE, ROADWAY EXCAVATION, HMA, CLASS 2 AB AND DRAINAGE WORK. |
Location Description | LASSEN COUNTY NEAR WESTWOOD FROM 1.3 MILES WEST OF GOODRICH CREEK BRIDGE TO 1.0 MILE WEST OF WILLARD CREEK ROAD |
QA Service Level | 1 (Verified on 03/02/2020) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
tim.crosby@dot.ca.gov | Tim Crosby | Resident Engineer | Caltrans RE DB |
jeff.rothgery@dot.ca.gov | Jeff Rothgery | Structural Representative | Caltrans SR DB |
Samples
Samples submitted for this project.
Displaying 11-20 of 38 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2021-10-13-41 | 10/13/2021 | 10/18/2021 | Department Acceptance | Hot Mix Asphalt | View |
2021-10-15-14 | 10/15/2021 | 10/18/2021 | Department Acceptance | Hot Mix Asphalt | View |
2021-10-08-20 | 10/08/2021 | 10/09/2021 | Department Acceptance | Hot Mix Asphalt | View |
2021-10-08-18 | 10/08/2021 | 10/09/2021 | Department Acceptance | Aggregate | View |
2021-10-08-17 | 10/08/2021 | 10/09/2021 | Department Acceptance | Reclaimed Asphalt Pavement | View |
2021-10-08-16 | 10/08/2021 | 10/09/2021 | Department Acceptance | Aggregate | View |
2020-10-06-38 | 10/06/2020 | 10/08/2020 | Informational | Asphalt Binder | View |
2020-07-01-44 | 07/01/2020 | 07/02/2020 | Verification | Hot Mix Asphalt | View |
2020-07-01-43 | 07/01/2020 | 07/02/2020 | Verification | Reclaimed Asphalt Pavement | View |
2020-07-01-42 | 07/01/2020 | 07/02/2020 | Verification | Aggregate | View |
Job Mix Formula (JMF)
JMFs associated with this project.
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods