Project Details
This page displays current information for project DEA: 030F2854.
Project Information
Project Identifiers | Project ID: 214680 DEA: 030F2854 EFIS: 0319000205 |
---|---|
DIST-CO-RTE-PM | 03-SAC-99-7.1/9.4 |
Award Date | 04/06/2020 |
Closeout Date | 10/30/2020 |
Work Description | Construct the temporary bridge superstructures, adjacent paving and pave temporary alignment |
Location Description | Not set |
QA Service Level | 1 (Verified on 03/02/2020) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
Masoud.Saed@dot.ca.gov | Masoud Saed | Resident Engineer | Caltrans RE DB |
chau.ha@dot.ca.gov | Chau Ha | Structural Representative | Caltrans SR DB |
Samples
Samples submitted for this project.
Displaying 11-20 of 39 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2020-03-02-21 | 03/02/2020 | 03/03/2020 | Quality Control | Concrete | View |
2020-03-03-36 | 03/03/2020 | 03/04/2020 | Quality Control | Concrete | View |
2020-03-04-18 | 03/04/2020 | 03/05/2020 | Quality Control | Concrete | View |
2020-03-05-18 | 03/05/2020 | 03/06/2020 | Quality Control | Concrete | View |
2020-03-06-21 | 03/06/2020 | 03/07/2020 | Quality Control | Concrete | View |
2020-03-09-14 | 03/09/2020 | 03/10/2020 | Quality Control | Concrete | View |
2020-03-11-40 | 03/11/2020 | 03/12/2020 | Quality Control | Concrete | View |
2020-03-12-14 | 03/12/2020 | 03/13/2020 | Quality Control | Concrete | View |
2020-03-13-23 | 03/13/2020 | 03/14/2020 | Quality Control | Concrete | View |
2020-03-17-8 | 03/17/2020 | 03/18/2020 | Quality Control | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods