Project Details
This page displays current information for project DEA: 07303904.
Project Information
| Project Identifiers | Project ID: 214671 DEA: 07303904 EFIS: 0714000044 |
|---|---|
| DIST-CO-RTE-PM | 07-LA-10-31.2/37.2 |
| Award Date | 11/25/2020 |
| Closeout Date | 10/11/2023 |
| Work Description | LANE REPLACEMENT |
| Location Description | LOS ANGELES COUNTY IN BALDWIN PARK AND WEST COVINA FROM 0.1 MILE EAST OF THE 10/605 SEPARATION TO 0.3 MILE WEST OF CITRUS STREET OVERCROSSING |
| QA Service Level | 1 (Verified on 01/21/2021) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| hai.hong@dot.ca.gov | Hai Hong | Resident Engineer | Caltrans RE DB |
| maziar.kazemian@dot.ca.gov | Maziar Kazemian | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 1-10 of 285 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2019-10-22-18 | 10/22/2019 | 10/22/2019 | Department Acceptance | Aggregate | View |
| 2019-10-22-19 | 10/22/2019 | 10/22/2019 | Department Acceptance | Aggregate | View |
| 2021-09-28-46 | 09/28/2021 | 10/29/2021 | Department Acceptance | Concrete | View |
| 2022-01-09-2 | 01/09/2022 | 01/11/2022 | Department Acceptance | Hot Mix Asphalt | View |
| 2022-01-09-3 | 01/09/2022 | 01/11/2022 | Department Acceptance | Hot Mix Asphalt | View |
| 2022-01-09-4 | 01/09/2022 | 01/14/2022 | Department Acceptance | Hot Mix Asphalt | View |
| 2022-01-09-5 | 01/09/2022 | 01/14/2022 | Department Acceptance | Hot Mix Asphalt | View |
| 2022-02-01-6 | 02/01/2022 | 02/01/2022 | Department Acceptance | Concrete | View |
| 2022-02-02-4 | 02/02/2022 | 02/02/2022 | Department Acceptance | Concrete | View |
| 2022-01-29-31 | 01/29/2022 | 01/30/2022 | Department Acceptance | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
