Project Details
This page displays current information for project DEA: 07303904.
Project Information
| Project Identifiers | Project ID: 214671 DEA: 07303904 EFIS: 0714000044 |
|---|---|
| DIST-CO-RTE-PM | 07-LA-10-31.2/37.2 |
| Award Date | 11/25/2020 |
| Closeout Date | 10/11/2023 |
| Work Description | LANE REPLACEMENT |
| Location Description | LOS ANGELES COUNTY IN BALDWIN PARK AND WEST COVINA FROM 0.1 MILE EAST OF THE 10/605 SEPARATION TO 0.3 MILE WEST OF CITRUS STREET OVERCROSSING |
| QA Service Level | 1 (Verified on 01/21/2021) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| hai.hong@dot.ca.gov | Hai Hong | Resident Engineer | Caltrans RE DB |
| maziar.kazemian@dot.ca.gov | Maziar Kazemian | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 71-80 of 285 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2022-02-12-5 | 02/12/2022 | 02/12/2022 | Quality Assurance | Concrete | View |
| 2022-02-12-6 | 02/12/2022 | 02/12/2022 | Quality Assurance | Concrete | View |
| 2022-02-12-7 | 02/12/2022 | 02/12/2022 | Quality Assurance | Soil | View |
| 2022-02-12-8 | 02/12/2022 | 02/12/2022 | Quality Assurance | Soil | View |
| 2022-02-12-9 | 02/12/2022 | 02/12/2022 | Quality Assurance | Aggregate | View |
| 2022-02-12-10 | 02/12/2022 | 02/12/2022 | Quality Assurance | Aggregate | View |
| 2022-02-13-1 | 02/13/2022 | 02/13/2022 | Quality Assurance | Concrete | View |
| 2022-02-13-2 | 02/13/2022 | 02/13/2022 | Quality Assurance | Concrete | View |
| 2022-02-12-11 | 02/12/2022 | 02/13/2022 | Quality Assurance | Concrete | View |
| 2022-02-12-12 | 02/12/2022 | 02/13/2022 | Quality Assurance | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
