Project Details
This page displays current information for project DEA: 081F7304.
Project Information
Project Identifiers | Project ID: 214663 DEA: 081F7304 EFIS: 0815000034 |
---|---|
DIST-CO-RTE-PM | 08-SBD-215-2.7 |
Award Date | Not set |
Closeout Date | Not set |
Work Description | REPLACE CONCRETE BRIDGE, PLACE CONCRETE PCPS GIRDERS AND HMA. |
Location Description | SAN BERNARDINO COUNTY IN COLTON AT WASHINGTON STREET OVERCROSSING |
QA Service Level | 1 (Verified on 02/24/2021) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
shaine.shahidi@dot.ca.gov | Shaine Shahidi | Resident Engineer | Caltrans RE DB |
joshua.fry@dot.ca.gov | Joshua Fry | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 1-10 of 198 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2021-08-06-34 | 08/06/2021 | 08/07/2021 | Quality Control | Concrete | View |
2022-01-12-9 | 01/12/2022 | 01/12/2022 | Quality Control | Concrete | View |
2022-01-17-9 | 01/17/2022 | 01/18/2022 | Quality Control | Concrete | View |
2022-01-18-9 | 01/18/2022 | 01/19/2022 | Quality Control | Concrete | View |
2022-01-19-9 | 01/19/2022 | 01/20/2022 | Quality Control | Concrete | View |
2022-01-20-13 | 01/20/2022 | 01/21/2022 | Quality Control | Concrete | View |
2022-01-21-4 | 01/21/2022 | 01/22/2022 | Quality Control | Concrete | View |
2021-10-25-29 | 10/25/2021 | 11/22/2021 | Quality Control | Concrete | View |
2022-01-24-46 | 01/24/2022 | 01/25/2022 | Quality Control | Concrete | View |
2022-01-25-31 | 01/25/2022 | 01/26/2022 | Quality Control | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods