Project Details
This page displays current information for project DEA: 081F7304.
Project Information
Project Identifiers | Project ID: 214663 DEA: 081F7304 EFIS: 0815000034 |
---|---|
DIST-CO-RTE-PM | 08-SBD-215-2.7 |
Award Date | Not set |
Closeout Date | Not set |
Work Description | REPLACE CONCRETE BRIDGE, PLACE CONCRETE PCPS GIRDERS AND HMA. |
Location Description | SAN BERNARDINO COUNTY IN COLTON AT WASHINGTON STREET OVERCROSSING |
QA Service Level | 1 (Verified on 02/24/2021) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
shaine.shahidi@dot.ca.gov | Shaine Shahidi | Resident Engineer | Caltrans RE DB |
joshua.fry@dot.ca.gov | Joshua Fry | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 21-30 of 198 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2022-06-28-56 | 06/28/2022 | 06/28/2022 | Quality Control | Aggregate | View |
2022-08-05-51 | 08/05/2022 | 08/05/2022 | Quality Control | Aggregate | View |
2022-08-19-77 | 08/19/2022 | 08/20/2022 | Quality Control | Aggregate | View |
2022-08-31-67 | 08/31/2022 | 09/01/2022 | Quality Control | Aggregate | View |
2022-09-15-87 | 09/15/2022 | 09/16/2022 | Quality Control | Aggregate | View |
2022-09-19-36 | 09/19/2022 | 09/20/2022 | Quality Control | Aggregate | View |
2022-09-23-67 | 09/23/2022 | 09/24/2022 | Quality Control | Aggregate | View |
2022-09-30-59 | 09/30/2022 | 10/01/2022 | Quality Control | Aggregate | View |
2022-10-20-67 | 10/20/2022 | 10/20/2022 | Quality Control | Aggregate | View |
2022-10-26-64 | 10/26/2022 | 10/26/2022 | Quality Control | Aggregate | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods