Project Details
This page displays current information for project DEA: 081F7304.
Project Information
Project Identifiers | Project ID: 214663 DEA: 081F7304 EFIS: 0815000034 |
---|---|
DIST-CO-RTE-PM | 08-SBD-215-2.7 |
Award Date | Not set |
Closeout Date | Not set |
Work Description | REPLACE CONCRETE BRIDGE, PLACE CONCRETE PCPS GIRDERS AND HMA. |
Location Description | SAN BERNARDINO COUNTY IN COLTON AT WASHINGTON STREET OVERCROSSING |
QA Service Level | 1 (Verified on 02/24/2021) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
shaine.shahidi@dot.ca.gov | Shaine Shahidi | Resident Engineer | Caltrans RE DB |
joshua.fry@dot.ca.gov | Joshua Fry | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 141-150 of 198 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2023-04-27-88 | 04/27/2023 | 04/28/2023 | Quality Control | Aggregate | View |
2023-04-27-89 | 04/27/2023 | 04/28/2023 | Quality Control | Concrete | View |
2023-05-01-53 | 05/01/2023 | 05/02/2023 | Quality Control | Aggregate | View |
2023-05-01-54 | 05/01/2023 | 05/02/2023 | Quality Control | Concrete | View |
2023-05-03-71 | 05/03/2023 | 05/04/2023 | Quality Control | Aggregate | View |
2023-05-03-72 | 05/03/2023 | 05/05/2023 | Quality Control | Concrete | View |
2023-05-05-80 | 05/05/2023 | 05/06/2023 | Quality Control | Aggregate | View |
2023-05-05-81 | 05/05/2023 | 05/06/2023 | Quality Control | Concrete | View |
2023-05-26-59 | 05/26/2023 | 05/27/2023 | Quality Control | Aggregate | View |
2023-05-26-60 | 05/26/2023 | 05/27/2023 | Quality Control | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods